CDC Build Pty Ltd

Completed project

Kinetic Bus Depot

Location
Portsmith
Sector
Industrial
Scope
Tilt panels only
Construction
Concrete tilt panel
Status
Completed April 2023
Kinetic Bus Depot, crane and braced panels

Gallery

On site at Kinetic Bus Depot

A concrete tilt panel being craned into position on a CDC Build site

Get in touch

Let’s talk about your project

Have a project in mind? Talk to a builder early.